精品一区二区在线欧美日韩_人人狠狠综合久久亚洲_色婷婷亚洲一区二区三区_国产精品久久久久精品综合

Wuxi Gotele Metal Products Co., Ltd : CN EN
Enamel pipe

Thickness: 0.5mm - 15mm


Outside Diameter: 8mm-325mm


Length: Customized


Capacity: 1000 Mt/month


Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

Product DetailTechnical InformationPackagingMore
Features:
1. The enamel tube has the characteristics of high temperature resistance, corrosion resistance, smoke resistance, and the service life is 3-5 times that of the ordinary air preheater. 
2. The enamel steel tube is manufactured with the enamel which is our own developed with scientific formula and is evenly coated on the surface of the steel tube by the auto enamel tube production line.
3. To use enamel tube as the heat exchanger parts will be anti-abrasion and anti-corrosion, the surface is smooth and low cost of maintenance. 
4. To adapt the different boiler burning type, different fuel and different fume ingredient, we developed the different enamel tube air preheaters to fit different medium.

Processing method: 

Raw Steel Coil - Slitting Into Request Width - High Frequency Straight Seam Welding (Hot Extrusion Process For Seamless) - Clearing burrs -

Cutting Request Length -Enameled Coating Process - Packing


Enameled Coating Tubes 
1. thickness: 0.5mm - 15mm
2. Outside Diameter: 8mm-325mm
3. Length: Customized
4. Capacity: 1000 Mt/month
5. Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

Packing: 

Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation.

In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.

1)Shanghai Metal Standard

2)Customization

Applications: 

Air Pre-Heater, Economizer, Water-Cooled Wall 

Advantages: 
1. Because the current boilers use the regenerative cycle, the steam turbine is used to extract the steam to heat the water. At this time, the economizer The function can no longer meet the energy saving requirements of the boiler, so the enamel tube air preheater must be installed.
2. Improve the fuel's ignition conditions, as well as some changes in the combustion process, to maximize fuel, saving fuel utilization. This is very substantial advantage.
3. When the air enters the furnace, because of the enamel tube air preheater, the theoretical combustion value is increased, and more importantly, the furnace radiation is enhanced and the heat transfer is enhanced to achieve energy saving of the boiler.
4. The task of the enamel tube can help air preheater upgrade the hot air, acting as a desiccant and porter of coal powder.

HomeTelProductsContact
CN EN
犍为县| 蕉岭县| 乌兰县| 泰兴市| 甘泉县| 岳池县| 诸暨市| 寻乌县| 江孜县| 加查县| 新密市| 红河县| 江门市| 玛沁县| 普陀区| 花莲县| 清镇市| 廊坊市| 河津市| 新平| 铜山县| 南木林县| 稻城县| 社旗县| 沽源县| 云梦县| 温泉县| 宜兰市| 自贡市| 永昌县| 伊春市| 陵川县| 苏尼特左旗| 平安县| 安阳市| 德化县| 永安市| 高碑店市| 花垣县| 华宁县| 罗田县|